Tile, fixtures and storage that look the part — over waterproofing you'll never see and never have to think about again.
Bathroom Renovation
Almost every failed bathroom we're called to rip out failed in the same place: behind the tile.
A bathroom is a wet room pretending to be a dry one. Tile and grout are not waterproof — the membrane behind them is. When a shower leaks two years after a remodel, it's rarely the tile that failed; it's a pan that wasn't sloped right, a niche that wasn't sealed, or a membrane that stopped an inch short.
So we build the invisible part properly. Sloped mortar beds, bonded waterproof membranes carried up the walls, corners and niches detailed and flood-tested before a single tile goes on. It adds a day. It's the difference between a bathroom that lasts and one that gets redone.
On top of that we'll fit the room out the way you actually use it: a vanity at the right height with drawers that clear the plumbing, lighting that doesn't put your face in shadow, ventilation sized for the room, and storage that isn't an afterthought.
What's included
Sloped pans, bonded waterproofing, frameless glass and niches set where you'll actually reach them.
Large-format, herringbone, mosaic floors — laid out so cuts fall in the least visible places.
Floating or furniture-style vanities, drawer boxes notched around plumbing, and proper linen storage.
Valve replacement, moving supply and waste lines, and fixtures set at heights that suit the people using them.
Layered lighting at the mirror instead of a single ceiling can, and an exhaust fan actually sized for the room.
Membrane, corners and pan flood-tested and documented before tile — the step most rushed jobs skip.
How it works
We look at what's behind the current bathroom — subfloor, framing, venting — before quoting, so nothing is discovered later.
Tile, vanity, fixtures and glass chosen together, with an elevation so you can see where every line lands.
Down to studs where needed, then pan, membrane and flood test before any tile is set.
Tile, grout, vanity, glass and fixtures, then a walkthrough with the water running.
Recent work
Marble walk-in shower and oak vanity
Brushed brass fixtures and stone detail
Finished interior, Round Rock TXQuestions
Can't find your answer? Ask us directly — we usually reply the same day.
A full renovation is typically 3–5 weeks. If it's your only bathroom, tell us early — we sequence the work differently and keep the down time to the shortest possible window.
Yes, and it's one of our most common requests. It usually involves moving the drain and rebuilding the floor slope, which is straightforward when it's planned in rather than improvised.
Where it needs it. Once we're down to studs we'll show you anything we find — rotten framing, old galvanised supply lines, missing blocking — and price the fix before carrying on.
Our craftsmanship warranty covers the installation for two years and materials carry their manufacturer warranty. The flood test result is documented for your records.
Also from Fox

Get Started
Book a free consultation and we'll walk the space, talk through scope, and put a realistic number on it. We serve Taylor, Hutto, Round Rock and Georgetown.