Finished bathroom in a home addition in Austin, TX

Project · Austin, TX

Home addition in Austin, TX

From framing to a finished bathroom, built onto an Austin home in 2026.

(512) 844-0199

The Project

More room, built from the frame up

A home addition we built for an Austin homeowner in 2026. It adds a new room, a hallway with closets and a full bathroom, finished outside with lap siding, new windows and wood entry stairs. The photos follow it from January, with the shell framed and wrapped, to late March, with the bathroom complete.

Location
Austin, TX
Project
Home addition
Completed
2026
Scope
Framing to finish

The Build

Stage by stage, in photos

Click any photo to see it full size, or play the walkthrough of the finished exterior.

STAGE 01

Framing to a finished exterior

The addition went up as a framed, sheathed shell under its own roof, then got house wrap and new windows to make it weathertight by mid-January. Lap siding, white trim and wood entry stairs finished the outside, as the walkthrough video shows.

Home addition in Austin at the framing stage with roof decking, sheathing and new entry stairs
Framing and sheathing stage
Home addition in Austin during construction with house wrap, new windows and a new entry stair
House wrap and new windows going in
Walkthrough · 0:45
Exterior walkthrough of the finished addition
STAGE 02

New rooms inside

Inside, the addition brings a bright new room, a hallway lined with closets and a sliding barn door into the bathroom, all on new flooring.

Bright new room in the Austin home addition with two windows, a ceiling fan and wood strip flooring
New room with wood floors and natural light
New hallway in the addition with white closet doors, wood floors and a window at the far end
Hallway with closets and wood floors
White sliding barn door with a mirror panel opening to the new bathroom, with wood-look flooring
Barn door entry and new flooring
View from the new wood floors of the addition into the kitchen with patterned tile and dark cabinets
Wood floors meeting the kitchen tile
STAGE 03

A full bathroom

The bathroom was finished in late March: gray subway tile, a frameless glass walk-in shower with a built-in niche, and a wood vanity with brass pulls under a wide mirror and bar light.

Finished bathroom in the Austin home addition with a wood vanity, white countertop and a frameless glass walk-in shower in gray subway tile
Full bathroom with a glass walk-in shower
New bathroom seen through a white sliding barn door with a mirror panel, wood vanity and glass shower
Sliding barn door into the new bathroom
Wood vanity with brass pulls, a white countertop, wide mirror and a bar light beside the glass shower
Vanity, mirror and lighting
Walk-in shower with gray subway tile, a built-in niche, hex floor tile and a frameless glass panel
Walk-in shower with a built-in niche

Keep exploring

More from Fox Remodeling

Fox Remodeling & Construction

Get Started

Planning an addition in Austin?

Book a free consultation and we'll walk the property, talk through the layout and put a realistic number on it. Permits are included and handled by us.

(512) 844-0199