Most bathroom remodels we build in Central Texas cost between $9,000 and $25,000. The finishes are the part you see; the waterproofing behind the tile is what keeps the room sound for years.
What $9,000 to $25,000 covers
That is our published range for a bathroom remodel, and it includes:
- Custom vanity and sink installation
- Tile flooring and shower surrounds
- Upgraded lighting and ventilation
- Waterproofing and plumbing
- A 1-year materials warranty
Same-layout refreshes sit toward the lower end. Moving plumbing, converting a tub to a walk-in shower or adding accessibility features carries a bathroom toward the top.
What moves the price
- Tub or walk-in shower. If it is the only bathroom, keeping a tub protects resale for families. In a primary suite with a tub elsewhere, a curbless walk-in shower is usually the better room.
- Waterproofing. We build the wet area on cement board or foam with a bonded membrane, tested before any tile goes on. It is the part of the job you never see and the part that makes it last.
- What is behind the wall. We price the visible work. If we open a wall and find rot or an old leak, we stop, show you and quote the repair before carrying on.
- Accessibility. Blocking for future grab bars, a curbless entry, a comfort-height toilet and a bench can all be built in so the room still reads as a well-designed bathroom.
How long it takes
Plan on two to four weeks for a full gut. The tile and waterproofing schedule sets most of that, because membranes and mortar need proper cure time, and that cure time is what keeps a new bathroom dry.
Two of our recent bathrooms
Here is what that range looks like in practice: two remodels, as we found them and as we handed them back. See more on our portfolio.


Master bathroom remodel
Central Texas

Walk-in shower remodel
Central TexasPermits and houses, city by city
Permits are included in every estimate and we handle them for you. Each city runs them a little differently, and the houses differ too:
Taylor, TX
Pre-war homes downtown are almost always pier-and-beam, which means plumbing can be rerouted from underneath rather than through a slab. Permits go through the city's MGO portal. Remodeling in Taylor
Hutto, TX
Production-built homes share a handful of floor plans, so we usually know what is behind the wall before we open it. Plan review through GovWell runs about fifteen days. Remodeling in Hutto
Round Rock, TX
Polybutylene supply lines show up in some late-1980s and early-1990s homes. If we find it during a bathroom job we will tell you, because remodeling around failing pipe is money thrown away. Remodeling in Round Rock
Georgetown, TX
Sun City homes are single-storey with wide doorways and low thresholds, so accessible bathrooms are common there, built in a way that keeps resale value. Remodeling in Georgetown
Austin, TX
Post-1980s homes are typically on post-tension slabs, so moving a bathroom means working around cables that cannot be cut. Residential review in Austin also takes longer than in Williamson County. Remodeling in Austin
How we price your bathroom
Every estimate starts with a free consultation at your home. You get an itemized quote, valid for 30 days, with permit fees included, and financing is available. Curious what your bathroom could look like first? Try our AI Bathroom Remodel Previewer, or see the full price list on our pricing page.